The submarine cable lands on the wind turbine platform.
Whether it is an offshore wind turbine platform, offshore booster station, or other offshore platform structures, the technological process is basically the same, including the main processes of ship anchoring, landing length delivery, and towing to the platform. Therefore, the construction preparation work needs to be fully carried out. This includes accurate measurement of cable length, arrangement of measures for various turns and turning points, pre arrangement of tractor and towing rigging, as well as arrangement of temporary fixation and permanent anchoring. At the same time, in our years of construction experience, our company has summarized and invented multiple patented technical measures such as submarine cable floating transportation, rapid pipe threading device, submarine cable protector CRP, CPS installation process technology, etc.
0086-021-6519 2621
Building 9, No. 98 Fulian 1st Road, Baoshan District, Shanghai
contactscoec@shanghaicable.cn
Official Account
link
0086-021-6519 2621
Calltop