Navigation Notice of 220kV Submarine Cable Laying Operation of 450MW offshore Wind Power Project at U site in the south of Haiwei Peninsula, Shandong

#Enterprise News ·2024-09-26

Shanghai Cable Ocean Technology Co., Ltd. will carry out the 220kV submarine cable laying operation in the offshore waters of Yushan City, Weihai City, Shandong Province. The relevant matters are hereby announced as follows:

 

I. Construction time:

 

June 28, 2024 to September 30, 2024.

 

II. Construction Area:

 

A36°32′49.81″N121°34′54.90″E

 

B36°32′49.75″N121°35′20.62″E

 

C36°33′8.82″N121°35′18.92″E

 

D36°33′32.81″N121°35′21.86″E

 

E36°34′33.51″N121°35′2.32″E

 

F36°39′5.27″N121°36′52.63″E

 

G36°42′56.34″N121°36′50.77″E

 

H36°43′51.94″N121°37′7.15″E

 

I36°44′18.05″N121°36′56.49″E

 

J36°44′13.95″N121°36′31.77″E

 

K36°43′50.57″N121°36′41.04″E

 

L36°42′56.22″N121°36′25.74″E

 

M36°39′8.38″N121°36′26.05″E

 

N36°34′32.88″N121°34′36.83″E

 

O36°33′30.32″N121°34′55.21″E

 

P36°33′9.38″N121°34′53.36″E

The water area range of the 16 submarine cable routing coordinate connection lines mentioned above.

 

III. Construction Vessels:

 

Kaibo 8, Harbor Tuo 19, Xinyu 16, Qunxing 12, Hailong 26.

 

IV. Matters needing attention

 

1. The operating ships should display the signal type in accordance with the regulations and listen to VHF16 channel.

 

2. The operating ships should pay close attention to the movements of passing ships and take safety measures in time.